Heat Treatment Service Procurement Guide

1. What Is Heat Treatment?

Heat treatment is a controlled process of heating and cooling metals to alter their physical and mechanical properties without changing the part shape. It covers annealing (softening), normalizing (grain refinement), quenching and tempering (hardening + stress relief), case hardening (carburizing/nitriding for surface hardness), and solution treatment + aging (for aluminum alloys).

China's heat treatment industry serves every sector from automotive fasteners (billions of parts/year) to aerospace landing gear components. The key challenge for overseas buyers is inconsistency — heat treatment is invisible after the fact: a poorly hardened part looks identical to a correctly processed one until it fails in service. Knowing what to specify, check, and verify is critical.

2. Key Technical Parameters

Process TypeTemp RangeCooling MediumHardness Achievable (HRC)Typical Case Depth
Through Hardening (steel)800–1050 °COil, water, polymer45–65 HRCFull section
Tempering150–650 °CAir (still or forced)20–55 HRCFull section
Carburizing (gas)880–950 °COil quenching58–64 HRC (case)0.3–3.0 mm
Nitriding (gas/plasma)480–560 °CSlow furnace cool62–70 HRC (case, HV scale)0.1–0.6 mm
Induction Hardening850–1000 °C (local)Water/polymer spray50–62 HRC1.0–6.0 mm
Vacuum Hardening1000–1100 °CHigh-pressure gas (N₂/He)58–65 HRCFull section
Solution + Aging (Al)480–540 °C (solution)Water quench + 170–200 °C age12–18 HRC (Brinell 80–150 HB)Full section
Annealing (steel)650–900 °CFurnace slow cool15–25 HRCFull section

3. Chinese Supplier Advantages & Cluster Regions

Dongguan / Shenzhen, Guangdong

China's largest commercial heat treatment cluster with hundreds of "heavy color" (热处理) shops. Most have vacuum furnaces (up to 1,200 × 1,000 mm chamber) + salt bath lines. Strong in tool steel (SKD11, Cr12MoV, H13) heat treatment for plastic injection molds and die casting dies. Quick turnaround: 24–48 hours for standard jobs. Prices from ¥2–5/kg ($0.30–0.70/kg). Quality: variable — audit your shop personally.

Ningbo / Wenzhou, Zhejiang

Hardware, fastener, and automotive component heat treatment hub. Continuous mesh-belt furnaces for mass production (1–10 tons/day throughput). Carburizing and carbonitriding for automotive fasteners — many shops have IATF 16949 certification. More consistent quality than Guangdong due to larger automated lines. Prices ¥1.5–3/kg ($0.20–0.45/kg) for mesh-belt production.

Kunshan / Taicang, Jiangsu

Premium precision heat treatment — aerospace and medical device tier. Vacuum furnaces with 6-bar or 10-bar gas quench capabilities (for HSS and powder metallurgy steels). Deep cryogenic treatment (−120 °C to −196 °C) lines for tool stability. Nadcap and AS9100 certified shops available. Prices ¥8–20/kg ($1.10–2.80/kg).

Risk warning: The biggest unknown in Chinese heat treatment is temperature uniformity. Many smaller shops do not perform periodic furnace calibration (SAT/TUS per AMS 2750). Always request the latest furnace calibration certificate before placing an order. We've seen 50 °C variance across a furnace zone in uncalibrated shops — that's enough to turn a batch of H13 tool steel into scrap.

4. Procurement Considerations & Common Pitfalls

The Quench Delay Trap

After austenitizing, the time between opening the furnace door and full immersion in quench medium is critical. For high-carbon and alloy steels, a delay of more than 10–15 seconds can cause premature pearlite formation at thin sections, resulting in soft spots. Chinese shops with manual transfer (trolley + basket) are more prone to this than automated lines. If your parts have thin cross-sections (< 5 mm), specify the maximum quench delay in your PO.

Decarburization — The Hidden Thief

When steel is heated in air, surface carbon combines with oxygen to form CO₂, reducing surface hardness by 3–8 HRC. For hardened and tempered parts, this means a soft skin that wears rapidly. Mitigation: specify inert atmosphere (N₂) or vacuum for surface-critical parts. For batch furnaces without atmosphere control, request minimum machining allowance of 0.3–0.5 mm per side for decarburized layer removal post-HT.

Martensite versus Retained Austenite

For tool and die steels (D2, A2, M2), retained austenite after quenching leads to dimensional instability — the part grows over time as austenite transforms to martensite at room temperature. Chinese shops that skip sub-zero treatment (−70 °C to −80 °C) are common. For precision tooling, specify cryogenic treatment and verify with X-ray diffraction or magnetic analysis.

5. Quality Control Key Points

6. Cost Breakdown

ProcessTypical Cost (per kg)Batch MinimumTypical Lead Time
Through harden + temper (normal)$0.20–0.60$30–801–2 days
Carburizing (gas)$0.40–1.00$50–1502–4 days
Nitriding (gas or plasma)$0.60–2.00$80–2001–3 days
Vacuum hardening$1.20–3.50$100–3001–2 days
Induction hardening (per piece)$0.50–5.00/pc$50–1501 day
Cryogenic (−80 to −120 °C)$0.30–0.80$50–100+1 day
Solution + aging (aluminum)$0.30–1.00$50–1501–2 days

Pricing note: Chinese heat treatment pricing is typically ¥1–10/kg ($0.15–1.50/kg). Heavy parts (gear blanks, shafts) are cheaper per kg. Small precision parts (mold inserts, punches) cost more due to fixturing and handling.

7. FAQ

Q: Can I skip tempering after hardening?

Absolutely not. Untempered martensite is brittle — it has high hardness but near-zero toughness. Quenched steel must be tempered immediately (within 4 hours) to transform some martensite to tempered martensite + relieve internal stresses. A typical H13 die steel: quenched to 55–58 HRC, then double tempered at 540 °C to 48–52 HRC with optimal toughness. Skipping temper means the part risks catastrophic failure under load.

Q: What is "black oxide" and is it a form of heat treatment?

Black oxide (blackening) is a chemical conversion coating — it creates a thin Fe₃O₄ magnetite layer on steel surfaces, typically at 135–145 °C in a caustic soda bath. While it requires heat, it does not change the steel's mechanical properties; it's purely a cosmetic and mild corrosion protection treatment. Do not confuse black oxide with heat treatment when specifying mechanical requirements.

Q: How do I know if my parts were properly heat treated without destroying them?

Nondestructive methods: portable hardness tester (Leeb or Telebrineller) on a flat ground surface, eddy current testing for case depth estimation, and Barkhausen noise analysis for grinding burn detection. For critical parts, include a test coupon (same steel grade, same cross-section, processed alongside production parts) in every batch that can be destructively tested. Insist on this from the start.

Q: Why do I get orange peel on anodized aluminum after heat treatment?

This is caused by fine surface pitting from the solution treatment quench — if the quench water is too hot (> 40 °C) or has poor circulation, steam pockets form on the surface creating local soft spots. Upon aging, these areas have different grain boundary precipitate morphology, leading to uneven etching response. Control the quench water temperature to 20–30 °C and ensure proper agitation.

Q: Is vacuum heat treatment worth the extra cost for mold steels?

For H13, 1.2344, and similar hot work tool steels — yes, absolutely. Vacuum eliminates decarburization (no heating scale), gives better surface quality, and allows high-pressure gas quenching for less distortion than salt bath. The added cost (~2x normal) pays for itself through fewer rejected dies. For cold work steels (D2, O1) in general mechanical parts, atmosphere-controlled box furnaces may be sufficient.